Page header background

Chiller plan design and installation

Chiller Installation Services

Well-Planned, Precise, and Efficient Design for Your Chiller Installation System

Achieve energy efficiency and optimal cooling performance for your building. Our team of expert technicians designs and installs custom chiller plants with high safety standards and precision accuracy.

Professional Technicians
Energy-Efficient System Design
Industry-Standard Materials & Components
Installation & Performance Warranty
Teknisi profesional melakukan instalasi Hepa

Quality Service

Precision Design & Warranty

Workmanship Warranty

Official Installation & Performance Warranty

Scope of Work

Our Installation Scope

We execute every installation project through clear, defined stages—from initial survey to handover—ensuring measurable and accountable results.

01

Design & Cooling Load Analysis

Cooling load calculations, chiller plant layout analysis, and mapping of electrical capacity and water flow prior to fabrication

Standardized SOP Stages
02

Chiller Unit & Cooling Tower Installation

Placement of chiller units (Air/Water-Cooled), cooling towers, and pumping systems in accordance with structural standards and vibration isolation requirements

Standardized SOP Stages
03

Piping & Central Electrical Installation

Installation of chilled water piping (with thermal insulation), main power cabling, and seamless integration of control panels/BMS

Standardized SOP Stages
04

Flushing, Pressurizing & Charging

Pipeline cleaning (flushing), hydrostatic pressure testing, vacuuming, and refrigerant charging according to unit technical specifications

Standardized SOP Stages
05

Testing & Commissioning

Testing of flow rates, Delta T, and pressure balance, along with system performance simulations before the chiller is certified ready for operation

Standardized SOP Stages
06

Handover & Warranty

Document handover as-built drawings, chiller system operating manual, building operator training, and installation warranty activation

Standardized SOP Stages
Engineering Standards & Quality

Why Proper Chiller Design & Installation is Crucial

The chiller plant is the single largest cooling energy consumer in commercial and industrial facilities (accounting for 40-60% of total building energy). Precision hydraulic design and installation guarantee optimal efficiency, eliminate Low Delta T Syndrome, and safeguard high-value compressor assets.

Chiller Plant Efficiency Fact

Improper pipe sizing and flow rate imbalances can trigger Low Delta T Syndrome, wasting up to 25% extra energy. Proper hydraulic balancing ensures chillers operate at their lowest nominal kW/TR rating.

Proses instalasi dan perancangan sistem chiller plant terstandar
Quality Assurance

Measured Commissioning, Zero Defects

Every installation follows rigorous engineering checklists, flow balancing tests, and manufacturer tolerances.

3 Core Engineering Pillars

Precision Engineering, System Integrity, and Energy Efficiency

Three engineering standards implemented by our expert team to ensure maximum reliability for commercial buildings, hospitals, data centers, and industrial facilities.

Thermal & Hydraulic Design

Precision Engineering & Hydraulics

Comprehensive cooling load calculations, precision hydraulic piping design, and accurate pump head estimation ensure uniform chilled water distribution across all AHUs/FCUs without flow dead spots.

  • Accurate thermal load & flow rate sizing
  • Hydraulic balancing of valves & headers
  • Inertia base & anti-vibration spring isolators
ASHRAE & AHRI Standard Certified
Piping Standards & Integrity

System Integrity & Durability

Implementation of ASME/ASTM piping standards, chemical flushing to eliminate weld slag and scale, plus vapor-sealed thermal insulation to prevent condensation and premature corrosion.

  • Chemical flushing & pipeline residue cleaning
  • Vapor-tight condensation-resistant insulation
  • Hydrostatic pressure test at 1.5x working pressure
ASHRAE & AHRI Standard Certified
kW/TR Optimization

Maximum Power Efficiency

Adoption of Variable Primary Flow (VPF), VFD modulation on pumps, and Building Management System (BMS) integration to achieve the lowest power consumption ratio (optimal kW/TR).

  • Low kW/TR energy consumption ratio
  • Load-adaptive pump VFD modulation
  • Automated BMS / BAS control integration
ASHRAE & AHRI Standard Certified